Dropped kerbs in Hampshire and Surrey: the two processes, the real fees and the licence to ask for
Hampshire lets you choose your contractor but insists on a licence and £10m of cover. Surrey will only allow its own approved contractors. Getting this wrong costs a non-refundable fee.
A dropped kerb is a small piece of construction wrapped in a surprising amount of process. The process is also completely different depending on which side of the county boundary you live on, and the application fees are non-refundable, so getting it wrong is expensive.
The single most important difference
In Hampshire you appoint your own contractor, but they must hold £10 million public liability insurance and a Section 171 road opening licence. In Surrey you cannot choose: the county will only permit one of its own approved contractors to build the crossing. Ask any contractor which county you are in and what licence they hold before you pay anybody anything.
Which authority you are dealing with
The council that grants planning permission is often not the council that owns the road. That trips up more people than any other part of this.
| Where you are | Planning | The road, and the crossing |
|---|---|---|
| Farnborough, Aldershot | Rushmoor Borough Council | Hampshire County Council |
| Fleet, Church Crookham | Hart District Council | Hampshire County Council |
| Alton and villages | East Hampshire District Council | Hampshire County Council |
| Camberley, Frimley | Surrey Heath Borough Council | Surrey County Council |
| Farnham | Waverley Borough Council | Surrey County Council |
| Woking, Guildford | Woking or Guildford Borough Council | Surrey County Council |
| Bracknell, Crowthorne, Sandhurst | Bracknell Forest Council | Bracknell Forest Council |
Hampshire: the process and the real numbers
Hampshire County Council administers vehicle crossings for Farnborough, Aldershot, Fleet, Alton and the rest of the county.
- Who applies: the property owner. If you are a tenant you need written permission from your landlord or housing association first.
- Fee: £211.90 for a standard application, non-refundable. Fast Track adds £97, so £308.90. There is no VAT, because it is a non-business service.
- Timescale: a response within 8 weeks as standard, or guaranteed within 2 weeks, that is 10 working days, on Fast Track.
- How long approval lasts: 12 months from the date of the approval letter, so do not apply years ahead of doing the work.
- The contractor: yours to choose. Hampshire does not keep a list of approved contractors and does not make recommendations.
- What the contractor must hold: £10 million public liability insurance and a Section 171 road opening licence. Hampshire is blunt about it, warning that a contractor proceeding without that licence would be doing so illegally.
- Utilities: the applicant is responsible for liaising with any utility company whose apparatus is affected. If there is a stopcock, a gas cover or a telecoms chamber in the footway, that becomes part of the job.
Surrey: a different process entirely
Surrey County Council runs a two-stage application and controls who does the work.
- Stage one: £80 for an initial assessment, non-refundable. A Local Highways Officer visits within 20 working days to assess the site and mark it out.
- Stage two: a further £150 for the full application, so £230 in total, also non-refundable. Stage two must be started within 6 months of stage one being approved.
- Contractor: you must use one of Surrey's approved contractors. This is not a preference, it is a condition.
- Construction cost: Surrey puts the building works at around £1,500 on average, varying with size, gradient, utility adjustments, street furniture and any traffic control needed.
- Re-marking: £80 if you need the site marked out again, non-refundable.
- The council's role: Surrey contacts the utility companies itself and manages the works with your chosen contractor, then inspects, and lab-samples some installations.
- If refused: declined applications are reviewed within 10 working days.
When you also need planning permission
Planning is separate from the crossing application, and it has to be in place first. Applying for the crossing without it wastes the fee. You will normally need it where:
- the access is onto a classified road, meaning an A, B or C road
- the property is listed, or in a conservation area
- the property is a flat or maisonette, or in multiple occupancy
- the application covers multiple dwellings, or commercial premises
- permitted development rights have been removed, which happens on some newer estates
- in Surrey, where you propose a non-porous parking surface
That last one links the two halves of the job together. If you are planning the driveway behind the crossing in impermeable block paving or concrete, you may need planning permission for the surface as well. Choose a permeable surface and you avoid that application entirely, at any size. Our guide on driveways and planning sets out why.
What it all adds up to, and how long it takes
Two separate costs, and it is worth keeping them separate in your head, because only one of them is ours.
| Cost | Hampshire | Surrey |
|---|---|---|
| Council application, paid to them | £211.90 | £230 |
| Faster option, paid to them | £308.90 | not offered |
| Construction, paid to your contractor | Quoted free, once the specification is known | Surrey puts its own average at around £1,500 |
| Realistic total time, enquiry to finished crossing | 2 to 3 months | 2 to 4 months |
Five questions to ask any contractor before you hire them
- Which highway authority is my road, and have you done crossings for them before?
- Can I see your public liability certificate, and is the cover at least £10 million?
- Will you take out the Section 171 road opening licence, and can I see it before you start?
- In Surrey: are you on the county's approved contractor list?
- Is reinstating the footway to the council's specification included in your price?
Any contractor who is vague about the licence is telling you something important. Ring us and we will tell you which process applies to your address, what it will cost, and whether we can do the crossing itself or only the driveway behind it. We would rather say so up front than take a deposit and disappoint you.
Questions people ask
How much does a dropped kerb cost in Hampshire?
Hampshire County Council charges £211.90 for a standard application, non-refundable, with a response within eight weeks. The Fast Track option adds £97, so £308.90 in total, and is guaranteed within two weeks. Construction is separate and depends on the width and the site.
How much does a dropped kerb cost in Surrey?
Surrey County Council charges £80 for the stage one initial assessment and a further £150 for the stage two full application, £230 in total, both non-refundable. Surrey puts average construction cost at around £1,500, varying with size, gradient, utilities and traffic control.
Can I use my own contractor for a dropped kerb?
In Hampshire, yes, but they must hold £10 million public liability insurance and a Section 171 road opening licence. Hampshire warns that a contractor proceeding without that licence would be working illegally. In Surrey you must use one of the council's approved contractors.
Do I need planning permission for a dropped kerb?
It is required where the access is onto a classified A, B or C road, for listed buildings and conservation areas, and for flats, maisonettes and multi-occupancy dwellings. Surrey also requires it where you propose a non-porous parking surface. Planning has to be in place before the crossing is approved.
Where this comes from
The rules, fees and figures on this page are taken from the sources below. Fees change, so check the current figure before you send anyone money.
- Hampshire County Council: dropped kerbs and vehicular access
- Hampshire County Council: dropped kerb specifications
- Surrey County Council: vehicle crossovers and dropped kerbs
This is general information about how the rules work, not advice on your particular property. If something here matters to a purchase or a dispute, get it checked on your own facts.
Rather just ask us?
No call-out fee and no charge for a conversation. If the answer is that you should be ringing your water company instead of us, we will tell you that.
01252 650804 Get a fixed priceBlocked drain, or a job you want priced properly?